三级网看小美女I97韩国电影I久久伊人操I国产91学生I亚洲成色777777在线观看影院I欧美俄罗斯性视频I波多野结衣久久久I欧美日韩国产免费视频I国产精品久久久久9999吃药

Welcome to Tianjin Guoce Aerospace Technology Co., Ltd!

Tianjin GuoCe Aerospace Technology Co., Ltd.

Inspection Industry Solution Provider

We are more professional.

Testequipment

Telephone:18322499311

Mobile phone:18920407795

Fax:022-22145487

E-mail:10533646999@qq.com

Address:Chagugang Town, Wuqing District, Tianjin

Lunar Surface Integrated Environment Module

  • Hot Line:18322499311

  

Lunar Surface Integrated Environment Module

1、 Execution standards


According to the equipment design and manufacturing, the acceptance of various indicators of the thermal vacuum test chamber should comply with GB/T32221-2015 "General Technical Conditions for Vacuum Thermal Environment Simulation Test Equipment for Spacecraft", QJ20126-2012 "Vacuum Container Specification for Spacecraft Space Environment Simulation Test Equipment", and QJ20127-2012 "Technical Requirements for Spacecraft Space Thermal Environment Test Equipment". The inspection tools and gauges required for final acceptance shall be provided free of charge by Party B. Any matters not covered shall be accepted in accordance with the national standard GJB-150 "Environmental Test Methods for Military Equipment".


2、 The purpose and characteristics of the equipment


This device is mainly used for High and low temperature tests, low-pressure discharge tests under high vacuum conditions on the lunar surface, and can also be used as a simulation test device for other small components in orbit.


This technical solution is one of the basis for designing and manufacturing the equipment. This equipment includes five aspects: thermal vacuum simulation container, vacuum protection system, high and low temperature protection system, thermal vacuum state control and display system, and auxiliary supporting system. The equipment developed based on this technical solution can truly simulate the cold and hot environment of a vacuum space, and can effectively control, monitor, and record the vacuum degree and temperature of the space. The device has the following characteristics.


The entire equipment vacuum system adopts a low-temperature pump as the main pump, with a screw dry pump as the front stage and pre pumping pump, which can achieve the required working vacuum degree for oil-free testing; In terms of temperature control, mechanical refrigeration is used to obtain a low-temperature background, and an intelligent PID temperature controller is used to control the heating current of the heating cage, thereby accurately controlling the temperature; The acquisition of low temperature adopts a unique mechanical refrigeration technology, which eliminates the cost of using liquid nitrogen refrigeration. The control system adopts a combination of industrial computer and PLC for joint control. The display interface of the industrial computer is clear and easy to understand, the PLC control is accurate and reliable, and the fault diagnosis is simple. In addition, different temperature curve formulas can be made according to the user's process requirements, stored in the industrial computer, and available for users to choose and call during the experiment, making it easy for users to master when conducting experimental operations. In summary, this equipment has high vacuum degree, easy temperature control and good uniformity, stable and reliable long-term operation, and can work continuously for more than 30 days. It is easy and convenient to operate and use. This device has certain specificity and universality, and is an essential equipment for space environment simulation experiments.


3、 Main technical indicators of the equipment system


(1) Internal dimensions of heat sink: φ 1000X1000mm (straight section)


(2) Vacuum box bracket: Bearing capacity: ≥ 60kg, the platform is sliding, with dimensions of 950mm in length and 700mm in width;


(3) Vacuum chamber size: φ 1100X1100mm (straight section)


(4) Ultimate no-load vacuum degree: ≤ 5X10-5Pa,


(5) Empty load vacuum degree:< 1X10-4Pa (room temperature) (arrived within 4 hours after opening the plug valve)


(6) Load vacuum degree ≤ 5X10-4Pa,


(7) Vacuum pumping rate: at room temperature inside the cabin, from atmospheric pressure to 20pa for no less than 10 minutes,


From atmospheric pressure to 5X10-4Pa, with a load of ≤ 150min


(8) Test temperature range: -70 ℃ to+150 ℃ (mechanical refrigeration+infrared heating cage)


(9) Temperature change rate: ≥ 1 ℃/min (rate of change measured on the acceptance specimen)


Average temperature rise from -70 ℃ to+85 ℃ throughout the entire process


Cooling average from+85 ℃ to -70 ℃ throughout the entire process


(10) Test piece heating power:


(11) Temperature uniformity: ± 3 ℃ (under stable temperature and vacuum conditions)


(12) Temperature control accuracy: ± 1 ℃ (measured under stable temperature)


(13) Temperature control method: PLC and manual coexist, all operations are implemented on the computer, with automatic instructions from the central computer, automatic display, automatic monitoring, automatic alarm and protection for branch circuits, and automatic fault diagnosis function. The industrial computer module management system has corresponding interlocking devices and can be programmed for temperature cycling tests.


(14) Temperature control points: a total of 20 (including 1 control point and 19 measurement points)


(15) Pollution analysis: Use a microbalance to test the amount of pollution. The frequency of the balance is 20MHz.


(16) Residual gas analysis: Monitor residual gases inside the container using a quadrupole mass spectrometer. Quality range: 200 quality quantity, H200M (Yingfukang Company)


(17) Low pressure discharge conditions: pressure maintenance can be achieved at a vacuum range of 1.33Pa and atmospheric pressure.


(18) Equipment noise: ≤ 75dB (1.5 meters from the ground and 1 meter from the controller) pre acceptance is tested on site


4、 Equipment configuration requirements


(1) Equipment configuration: All necessary peripherals (circulating water machine, air source, various flanges, etc.) need to be fully equipped


(2) Extraction system:


A main molecular pump: 3600L/s


B Pre stage pump: Vacuum pump from Germany Laibao or Beiyi Youcheng,


(German Leybold has a 5-month warranty and a 1-year warranty, while Beiyi Youcheng has a 3-month warranty and a 2-year warranty, optional)


(4) Vacuum measurement system: choose high-quality Pirani, ionization gauge, and digital vacuum gauge from China


(5) Heating and cooling system: Adopting a new technology of imported refrigeration water-cooled compressor unit, PID temperature control regulation is used, and a stable and reliable temperature control method is adopted, namely mechanical refrigeration+thermal cage temperature control. All other refrigeration system components are of good quality.


(6) Heat sink structure: Made of copper or stainless steel with minimal air release, and with uniform temperature distribution in the heat sink.


(7) Vacuum chamber: Stainless steel 1Cr18Ni9Ti or other better performing stainless steel should be used, and 8mm is recommended.


(8) Observation window: The main door has a 200mm observation window directly.


(9) Internal lighting: 100W


(10) Vacuum flange: Multiple 240mm flanges are opened on both sides of the container.


(11) Measurement location: Pirani and ionization gauge are installed at the front of the container.


(12) Container support plate: The size of the support plate should be as large as possible, and the stress point of the support plate should be on the tank body. The cold plate can be leveled.


(13) General control system: This equipment is a fully automatic control system.


(14) Equipment features: This equipment is a horizontal pure oil-free high vacuum system.


(15) Install a mechanical cold trap at the pumping port of the molecular pump (the molecular pump is only used under special conditions).


5、 Functional requirements for control management and data acquisition system


(1) Control management


Managed through PLC, the PC automatically controls the test of the tested object (can be programmed to perform temperature cycling tests). All working states of the vacuum subsystem, temperature cycling system, container re pressure, water circulation system, measurement system, etc. are controlled and managed, and there is a manual control system that is independent of the computer. Its functions are as follows:


Display the segmented curve of the test sample and the specific position of the current test throughout the entire process on the screen, with printing function.


Real time display of the working status of each component of the vacuum subsystem on the screen, overlaid with the vacuum degree obtained from data acquisition, and equipped with printing function.


Real time display of operating functions such as vacuum pump dry pump, molecular pump, gate valve, vent valve, low-temperature regeneration, ionization gauge baking, etc. on the screen.


Real time display of various parameters and curves of the cryogenic pump on the screen.


Real time display of various operational events on the screen, with safety protection measures such as subsystem fault alarm display and horn sounding.


It can achieve both vacuum testing and vacuum temperature composite testing, and both vacuum and temperature can be controlled by fixed values. It can automatically record temperature and vacuum values as required, and form graphics automatically. It is equipped with a USB interface for exporting data in Excel file format.


(2) Data collection


Equipped with 30 Pt-100 temperature sensors, the sensors can freely switch and control the heat sink and specimen temperature during the experiment.


The equipment control adopts an automatic control program.


40 plug-in columns are required, with a current of 10A.


The Y-27 connector has a total of 300 pins.


Real time collection, display of vacuum degree in the vacuum container and other locations of the vacuum subsystem, and overlay on the working condition map, with printing function.


Real time collection, display of temperature at different measuring points of the test sample, with printing function.


It has storage and printing functions for various pressures and temperatures that have occurred.


Real time display and output of dynamic curves of pollution and residual gas levels.


The software has independent intellectual property rights and is free to upgrade and maintain for life.


6、 Equipment composition design


1. The equipment mainly consists of the following parts:


(1) Vacuum simulation container (vacuum chamber and internal support)


(2) Vacuum protection system (vacuum pump, valve, pipeline, and vacuum measurement)


(3) Temperature protection system:


Low temperature refrigeration system: (Area temperature control refrigeration unit, heat sink, low-temperature valve and connecting pipe)


Heating and temperature control system: (heating cage, heating power supply)


(4) Control and monitoring system (cabinet, industrial computer, PLC).


(5) Auxiliary supporting systems (air pump, cooling circulating water machine, pollution monitoring)


7、 Technical content of equipment subsystem:


1. Vacuum simulation container


1.1 Structural form of vacuum container: horizontal cylindrical body, support frame directly landing, rear end with head welded to the body, front end with head gate.


1.2 Vacuum container material: Stainless steel 304, with a wall thickness of not less than 8mm.


1.3 Vacuum container size: φ 1100X1100mm (straight section size).


1.4 Vacuum container center to ground height: 1500mm


Install a heat sink inside the 1.5 cylinder, and install a heating cage inside the heat sink. The heating cage has guide rails and a test piece platform.


1.6 The gate flange is sealed with a low gas release rate fluororubber ring.


1.7 The container has good grounding, with a ground resistance of ≤ 0.1 Ω.


There is a glass observation window (with a diameter of 240) installed at the center of the entrance.


Above the cylinder, there are high and low vacuum measurements, thin film gauges, and two large flanges (diameter).


Install low-voltage 12V lighting fixtures and corresponding sealed joints (diameter) above the 1.10 container.


1.11 Install a sealed joint (diameter) of temperature sensor PT100 above the container.


There are two flanges (diameter 240, flange) on each side of the 1.12 cylinder for connecting test products.


The rear head of the 1.15 cylinder is equipped with two inlet and outlet main pipeline connection flanges (with a diameter of φ 150 and flanges) for heat sinks.


The rear head of the 1.16 cylinder is also equipped with a heating cage electrode lead connection flange (diameter of φ 150, flange)


The rear head of the 1.17 cylinder is equipped with an electrically operated gate valve of corresponding caliber and a 3600 liter/second pumping molecular pump (with a diameter of 400 and flange).


The rear head of the 1.18 cylinder is equipped with a flange (diameter φ 500) that connects to the low-temperature pump plug valve


Install the connecting flange (with a diameter of 100) of the pre extraction pipeline pre extraction valve at the appropriate position on the cylinder.


1.20 Install the connecting flange (KF40) of the vent valve at the appropriate position on the cylinder body


8、 Vacuum protection system


1. Vacuum pump


1.1 Main vacuum pump: a vacuum pump that reaches the maximum vacuum degree in the vacuum chamber, using domestically produced products, model: pumping speed 3600L/s


1.2 Auxiliary vacuum pump: a vacuum pump used to achieve a certain level of vacuum in the vacuum chamber, using * * company's mechanical pump, model: pumping speed 9L/s


2. Pipeline


All pipes are made of stainless steel metal, and some connections are made of stainless steel metal corrugated pipes.


3. Vacuum measurement


3.1 Film Gauge # 1: Full pressure low vacuum measurement, range 105Pa~102Pa, product of Shanghai Zhentai Instrument and Meter Company.


3.2 Resistance gauge: used to measure the low vacuum degree of the vacuum chamber, with a range of 105Pa~100Pa, a product of Chengdu Zhenghua Instrument and Meter Company.


3.3 Ionization gauge: used to measure the high vacuum degree of the vacuum chamber, with a range of 100Pa~10-5Pa, a product of Chengdu Instrument and Meter Company.


3.4 B-A gauge: Used to measure the ultra-high vacuum degree of vacuum chambers, ranging from 10-2Pa to 10-7Pa, a product of the Radio Department of Peking University.


4. Underframe


Connect the vacuum container with it, fix it directly on the ground, and make reasonable connections with other systems.


9、 Temperature guarantee system


The temperature guarantee system is divided into low-temperature heat sink, high-temperature heating system, and temperature control system


1. Low temperature system


Low temperature refrigeration unit: using German Bitzer compressor, CASCade mechanical refrigeration compressor unit, PID temperature control regulation, stable and reliable refrigeration method, and imported component refrigeration unit. To achieve the lowest background temperature for the heat sink, this low-temperature refrigeration unit has many advantages such as low cooling temperature, low power consumption, easy use, and reliable performance


This article is a technical proposal for a thermal vacuum test equipment (mechanical refrigeration), which is designed and written based on the proposed technical requirements for the thermal vacuum test equipment (mechanical refrigeration). The equipment is mainly used for high and low temperature tests under high vacuum conditions on the lunar surface. This plan extracts the technical requirements and other requirements for the thermal vacuum test equipment (mechanical refrigeration), provides our design for the equipment composition and related equipment technical content, and puts forward requirements for the equipment's usage conditions. In addition, it also clarifies some other content related to equipment support. It is one of the original documents for designing and manufacturing the equipment, and also one of the references for equipment delivery and acceptance.


Oil free vacuum system high and low temperature system control monitoring system


2. High temperature heating and temperature control system


The use of a power regulation module with technology, a temperature control instrument with PID self-tuning, and a heating cage with resistance heating method results in higher temperature control accuracy and greater safety factor. The temperature control system mainly controls the test temperature of the product through automatic temperature control instruments and temperature sensors.


The heating control part includes a heating cage, a vacuum sealed heating electrode, a transformer, a voltage regulating module, and a temperature control box


10、 Heat sink system


The main heat sink tube is made of copper plate and copper tube, with a ribbed coil structure. The outer surface is coated with bright nickel and the inner surface is coated with F26 special black paint. The heat sink is placed in a vacuum container to provide a cold black background for product testing. There are support frames and work platforms installed inside the container. The support frame passes through the heat sink and is fixed on the vacuum chamber shell.


1. Heat sink structure form: rib coil type


2. Effective size of heat sink: φ1000X1000mm;


3. Heat sink material: purple copper;


4. Working environment of heat sink: vacuum state


5. Heat sink bearing internal pressure:> 1.3Mpa


6. Total leakage rate of heat sink:< 5X10-10 Pam3/s


7. Absorption rate of the inner surface of the heat sink:> 0.90;


8. Inner surface of heat sink: coated with black paint F26;


9. Heat sink outer surface: bright nickel plating


10. Minimum temperature of heat sink wall:- 70℃


11. Gate heat sink: The gate is equipped with a heat sink to ensure temperature uniformity. The refrigeration unit provides refrigerant separately.


12. Workpiece mounting plate: used to fix workpieces. The installation board can be freely pushed in and out.


13. The workpiece mounting plate has fixing means to prevent the workpiece from vibrating and causing the mounting plate to move during operation. The size of the installation board is to be determined, with a load-bearing capacity of 100kg.


14. Connecting pipe: The external connecting pipe is made of copper pipe and connected by a bell mouth connection method. The internal connecting pipe is protected by a metal mesh corrugated pipe and sealed with a VCR type structure. Externally wrapped with polyethylene insulation pipe, with minimal cooling loss and no frost formation on the outside.


11、 Monitoring system


1. Auxiliary system


The auxiliary system includes air pump, cooling circulating water machine, overheating, etc.


2. Air pump


Provide original power for vacuum valves. (4~6kg/cm2) Low noise air compressor or other air source.


3. Cooling circulating water machine


Cooling molecular pumps and refrigeration units to save water resources. One vacuum unit and one refrigeration unit are used.



Recommended products

主站蜘蛛池模板: 性欧美丰满熟妇xxxx性仙踪林 | 伊人久久婷婷色综合98网 | 国产精品偷伦视频免费观看了 | 中文字幕天天躁日日躁狠狠躁 | 日韩欧美在线一区 | 亚洲ⅴ欧洲第一的日产av | 激情亚洲网| 黑人强伦姧人妻久久 | 亚洲自拍偷窥 | 国产成熟女人性满足视频 | 国产精品成色www | 无码小电影在线观看网站免费 | 国产xxxx性hd极品 | 午夜男人av | 欧产日产国产精品三级 | 97影院在线午夜 | 国产91九色| 亚洲欧美国产精品专区久久 | 国产欧美日韩中文久久 | 免费成人蒂法网站 | 午夜一区二区亚洲福利vr | 国内精品久久久久久影院8f | 香蕉啪视频在线观看视频久 | 性史性dvd影片农村毛片 | 粉嫩av一区二区三区粉 | 成人精品999 | 成午夜精品一区二区三区 | 无码成人1000部免费视频 | a免费观看 | 亚洲日韩穿丝袜在线推荐 | 国内精品久久久久影院亚瑟 | 精品国产乱码久久久久久口爆 | 日韩亚洲国产欧美 | 成人爽a毛片免费视频 | 天堂аⅴ在线最新版在线 | 中文字幕在线视频不卡 | 欧美性猛交xxxxx按摩欧美 | 一级国产精品一级国产精品片 | 国产成人综合色就色综合 | 欧美爱爱网站 | 精品国产一区二区三区护卡密 | 欧美福利专区 | 动漫3d精品一区二区三区乱码 | 欧美影视精品久久 | 久久av色欲av久久蜜桃网 | 一区精品在线观看 | 亚洲乱码中文字幕综合234 | 91精品国产二区在线看大桥未久 | 男人a天堂手机在线版 | 黑人巨茎大战欧美白妇 | 成年人黄色免费网站 | 在线观看无码av网址 | 一本无码中文字幕在线观 | 91成人xxx | 特级黄色一级片 | xxxxx在线视频 | 一二三区毛片 | 强奷漂亮饱满雪白少妇av | 亚洲欧洲日产国码无码动漫 | 综合激情亚洲 | 丰满人妻被公侵犯中文版 | 国产免费一区二区三区在线能观看 | 久久久久黄色片 | 91精品孕妇哺乳期国产 | 爆爽久久久一区二区又大又黄又嫩 | 免费久久人人香蕉av | 国产精品揄拍一区二区 | 美女av在线播放 | 99re6在线观看国产精品 | 中文久久乱码一区二区 | 国产a三级 | 偷拍女人私密按摩高潮视频 | 大陆熟妇丰满多毛xxxx | 亚洲宅男精品一区在线观看 | 91九色视频在线观看 | 欧美国产日韩a欧美在线视频 | 性欧美视频videos6一9 | 性xxxxx大片做受免费视 | 2018亚洲男人天堂 | 大胆欧美熟妇xxbbwwbw高潮了 | 国产视频第二页 | 在线亚洲天堂 | 91视频插插插 | 欧美成人黄色小说 | 国产手机av片在线观看 | 性娇小13――14欧美 | 成人午夜做爰视频免费看 | 欧美俄罗斯40老熟妇 | www.男人天堂 | 日韩欧美国产网站 | 综合久久久久6亚洲综合 | 大肉大捧一进一出视频 | 欧美精品久久久 | aaa少妇高潮大片免费看088 | 午夜伊人网 | 亚洲精品午夜久久久久久久 | 日韩欧美中文 | 中文字幕乱码亚洲精品一区 | 亚洲国产精品va在线观看香蕉 |